This bathroom renovation began after the space was partially demolished due to water damage. I led the redesign, developing a cohesive material palette and selecting all finishes, including cabinetry, tile, plumbing fixtures, and lighting. While the layout remained similar to the original, I reconfigured the shower to create a larger and more functional space. I have been involved throughout the renovation process, ensuring the design vision is carried through construction, which is now nearing completion.
Area of site | 120ft2 |
Date | 2025 |
Status of the project | Under construction |
Tools used | AutoCAD, SketchUp |
The project is still underway. The final steps are countertop fabrication, shower glass installation, and framing the mirror.